ASX Announcements:
Stanmore announces Updated JORC Resource for Isaac Plains Complex
HIGHLIGHTS
- Total JORC Resource has increased from 76.9Mt to 79.2Mt with a significant level (70%) as Measured and Indicated ResourcE
- Total Resource includes the open cut and underground JORC Resource for the Isaac Plains mine (48.5Mt) and Isaac Plains East Project (30.7Mt)
Source
____________________________________________________________________________________________
Stanmore announces JORC Reserve Increase for Isaac Plains Complex
HIGHLIGHTS
- Total JORC ROM Reserve has increased by 8% from 15.2Mt to 16.4Mt
- Open-cut mine life has increased to provide a mine life to 2029 that include the Isaac Plains East Project area and additional strips at Isaac Plains
- Strip ratio at Isaac Plains East Project is significantly lower for the first 3 years than current open-cut operations at Isaac Plains
- Additional coal quality drilling at Isaac Plains East Project displays improved coal rank and yield for semi-soft coking product relative to Isaac Plains
Recent Comments